Procurement note
The OLT Order I Almost Shipped Wrong: A 36-Hour Rush, One Missed Spec, and the Checklist That Now Saves Us Thousands
A rush OLT sourcing story about 10G and XGS-PON equipment, port configuration mismatches, and the 20-minute pre-shipment check that turned a near-disaster into a permanent process change.
Continue Reading